Salient Features of VDS for DS/NRS
i. The Scheme is open up to 31.3.2004 to regularize the extension in load
of DS/NRS consumers
ii. The computation of the total load for DS/NRS consumer shall be done as
follows and the consumer shall be required to fill Application & Agreement
form for the total load:-
|
Description
|
Domestic
|
NRS
|
Remarks
|
|
Light Point
|
60 Watts each(1/2 of total No. of light points
to be taken into account) |
80 Watts each |
Fraction of light points under DS category to
be taken as one point. |
|
Fan Points
|
80 Watts each |
100 Watts each |
|
|
Wall sockets
|
60 Watts each (1/4 of total No. of sockets to be taken into
account). |
80 Watts each (1/3rd) of total No. of sockets to be taken
into account). |
Fraction of socket points to be taken as one socket. |
|
Power sockets
|
1000 watts each (1/3rd of total No. of sockets to be taken
into account) |
2000 watts each (1/2 of total No. of sockets to betaken into
account). |
Fraction of socket to be taken as one socket. |
The test report shall be prepared by JE/In charge for the total load and the
same shall be kept in the consumer file. No test report shall be required to
be furnished by the consumer.
Additional load as declared by the consumer shall be deemed to have been regularized
from the date of submission of A&A forms and deposit of ACD and Service
Connection Charges at the rates given in preceding paras.
iii. The total load(including unauthorized extension) shall be governed for
the purpose of regulating service connection charges in the specific slabs,
but the actual charges are to be recovered for the unauthorized load only.
iv. Augmentation of service line/transformer and the power system including
change of meter etc. shall be done by the Board at its own cost.
v. The existing consumers already having separate connections in the same premises
shall be eligible to get extensions.
vi. Regularisation of load under this scheme shall be done without recovering
any load surcharge.
Salient Features of Voluntary Disclosure Scheme for Regulation of Extension
of Load in Agriculture Sector
Being introduced now to remain valid up to 30.6.2004:-
i. AP consumers who got AP connections released under general or any other priority
category shall deposit Rs.4000 per BHP for all types of motors for unauthorized
loads irrespective of the type of pump set installed.
ii. ACD @ Rs.200/- per BHP for the extension in load shall be deposited.
iii. The regularization shall be done immediately as deemed regularization on
detection of unauthorized load or self declaration by the consumer regarding
unauthorized load. The formalities regarding submission
of the sanction of A&A forms shall be done later on. The consumer shall
install the shunt capacitors of requisite capacity as per the total load and
the test report should indicate the installation of such a capacitor.
iv. No load surcharge on self declaration or detection through checking shall
be recovered from the AP consumers during the validity of the scheme.
v. Augmentation of the line and distribution transformer, wherever required
after its close verification by Sr.Xen/Op concerned shall be done by PSEB at
its cost. For the purpose of regularization of the load, the loading of
the transformers may be taken as 100% instead of the existing 80%. Secondly,
in case with the addition of unauthorized load the loading becomes beyond
100%, the transformer up to 63/100 KVA may be installed on the existing pole
mounting sub-station with the prior approval of SE/Op
vi.The scheme shall remain valid up to 30.6.2004 . After the closure of the
scheme in case tube well consumer is detected to have installed unauthorized
load or himself declares the unauthorized load, his case for regularization
of unauthorized load shall be considered provided he pays the consumption charges
for the last six months in addition to the regularization charges mentioned
in Para (i) & (ii) above.